Gravitt Road Wastewater Pump Station

Gravitt Road Wastewater Pump Station

Gravitt Road Wastewater Pump Station The Gravitt Road Pump Station serves several residential developments in the northern portion of the City of Cumming’s service area and includes two 88-HP Flygt Model Flygt Model CP-3300. Interested In Working With Us? Get In...
PWPF Settled Solids Dewatering Facility

PWPF Settled Solids Dewatering Facility

PWPF Settled Solids Dewatering Facility The City of Cumming operated an 18.0 MGD potable water production facility that used a series of shallow ponds to remove solids generated by the water treatment process. The settled solids removal process in the shallow pond...
Troublesome Creek Influent Wastewater Pump Station

Troublesome Creek Influent Wastewater Pump Station

Troublesome Creek Influent Wastewater Pump Station The Troublesome Creek Influent Pump Station serves the Sun City Peachtree Development plus will serve future adjacent development. The initial phase of the Troublesome Pump Station includes two 130-HP Flygt Model...
1.0 Million Gallon Hendrix Road Elevated Water Tank

1.0 Million Gallon Hendrix Road Elevated Water Tank

1.0 Million Gallon Hendrix Road Elevated Water Tank The Hendrix Road 1.0 Million Gallon Elevated Water Tank provides water to the City of Cumming’s customers in the northern portion of the City’s service area. This tank is the most recent tank project CEC has designed...
Cumming Potable Water Production Facility

Cumming Potable Water Production Facility

Continuous Sludge Collection System The City of Cumming 6.0 MGD Potable Water Production Facility (PWPF) (shown in the photo near the ball fields) represents an upgrade to the City’s existing 18.0 MGD PWPF. Construction was completed in June of 2009. The...